Sunday, 23 September 2012

First signs

Just had a little ride into Oldham to see the metro link works. Track laying has begun now and the dug out section that goes down to Manchester street roundabout is taking shape. The town is still a mess though with roadworks. Mumps looks finished so I can understand why the cones are all still there. I read that testing on the line to Rochdale and to Droylsden was due to start very soon so will be keeping an eye out for that.

4 comments:

  1. I wish they would move the cones at Mumps, tired of seeing them now. Traffic lights were out of order there today though, so I guess they still needed the cones so they could close the right turn onto the bypass :-(

    ReplyDelete
    Replies
    1. at last we have B9s on the 350 been 37382 to 88/37412/13/14/33 to 38 also roadworks in uppermill is just beyond a joke now

      Delete
  2. Stagecoach bus at Oldham hospital looked like an Ashton bus which route is that.

    ReplyDelete
    Replies
    1. Anonymous25/9/12 21:30

      The 183 to Limeside, via Oldham bus station.

      Delete