Sunday 23 September 2012

First signs

Just had a little ride into Oldham to see the metro link works. Track laying has begun now and the dug out section that goes down to Manchester street roundabout is taking shape. The town is still a mess though with roadworks. Mumps looks finished so I can understand why the cones are all still there. I read that testing on the line to Rochdale and to Droylsden was due to start very soon so will be keeping an eye out for that.